Project details
- Registered developer
- North Dubailand Projects L.L.C
- District
- Wadi Al Safa 5
- Unit prices
- Enquire for current availability
Construction & registration
Inspection: 5 Oct 2026
- DLD project number
- 3455
- Registered project name
- La Tilia At Villanova Phase 1
- Registered developer
- North Dubailand Projects L.L.C
- Registered area
- Wadi Al Safa 5
- Registered units
- 410
- Construction start in register
- 21 Jan 2025
- Declared handover in register
- 21 Aug 2028
Register snapshot supplied by Continental Club Property, based on DLD data. Dates and unit counts refer to the registered project, which may include several buildings. Declared handover is not confirmation of actual handover.
About the project
La Tilia Phase 1 is a defined release within Dubai Properties’ Villanova community in Dubailand. The developer’s April 2026 construction announcement assigns 410 homes to Phase 1 and treats Phase 2 separately. Across La Tilia, the advertised offering includes three- and four-bedroom townhouses with different storey arrangements. That distinction matters in a resale search: a La Tilia label does not establish the phase, exact design or position of the offered home. Request the registered project and unit reference before comparing its price with a later release or another Villanova neighbourhood.
Evaluate how the floors work for your household
The wider La Tilia presentation includes ground-plus-one and ground-plus-two options, so our recommendation is to start with a floor-by-floor comparison. Ask which arrangement belongs to the actual Phase 1 unit and locate the principal bedroom, guest accommodation and outdoor spaces on its plan. Consider how often your household would use the stairs, where children would play and whether working from home requires a separated room. Do not assume that two homes with the same bedroom count distribute living space in the same way. Record internal and plot measurements separately, then assess the entrance, parking and garden connections using the specific drawing.
Keep the first phase identifiable throughout the sale
An owner preparing a La Tilia Phase 1 exit should make the phase visible in the description, supporting plans and private document pack. Use a marked plot rather than an overall Villanova pin to explain location. Show which roads or homes surround it and how access to community facilities would work. Ask for the latest account statement and unit correspondence before discussing the balance to be taken over. A community construction announcement can provide context, but it does not replace the property’s own delivery information. Likewise, a claimed original-price saving needs the relevant agreement and a clear explanation of what is included. This approach gives buyers a coherent comparison without borrowing another release’s terms or timing.
Available property exits
Your project questions, answered.
Who develops La Tilia At Villanova Phase 1, and where is it?
La Tilia At Villanova Phase 1 is listed under North Dubailand Projects L.L.C in Wadi Al Safa 5, UAE. The district identifies the project area, not the position of an individual unit.
What construction information is available for La Tilia At Villanova Phase 1?
Registration 3455 records 13.75% construction completion, with an inspection dated 5 Oct 2026. This is a dated DLD-derived register snapshot supplied by Continental Club Property, not live construction monitoring. A declared handover date is not confirmation of actual handover.